All steel used in construction of the Erie Strayer plants is North American manufactured and a minimum of ASTM A36 (mill certified). Many competitive plants are fabricated of “mild steel” with low carbon content resulting in lower strength, lower hardness/wear resistance, and rapid corrosive attack.
All steel liners used in Erie Strayer plants are a minimum of 1/4″ AR400 which is a minimum of 400 Brinell hardness. Most competitive plants utilize 3/16″ AR225 or 235 Brinell which have an average hardness and not guaranteed.
Steel preparation, prior to painting is by use of Wheelabrator shot blast booth assuring complete removal of all mill scale and other foreign contaminants prior to application of prime coat. Surface profile is greatly enhanced assuring the bond of paint to steel. Most competitive plants receive power tool cleaning only.
All Erie Strayer plants are factory wired and plumbed to a level far beyond the industry standard. This results in time and expense savings at time of installation. All major sections of the plants are completely wired to a junction box and plumbed to single point for interconnection. Many competitive plants are not wired nor plumbed, requiring all connections to be made in the field at time of installation.
Erie Strayer plants are equipped with superior purchased components such as Ingersoll-Rand air compressors; Parker-Hannifin hydraulics, pneumatic cylinders, solenoid valves; Continental (Goodyear) belting; Dodge shaft mounted reducers and bearings; Bray butterfly valves; VIBCO vibrators. All Erie Strayer pneumatic components, e.g., air cylinders, solenoid valves and air vibrators are permanently lubricated which does not require the use of an air line oiler. Many competitive plant manufactures utilize components that are off brand and not available universally throughout the world.
All Erie Strayer plants and mixers are factory assembled and tested prior to shipment, assuring proper fit and operation. Mixers, belt conveyors, water systems, scale systems, etc., are all run and checked for proper operation prior to shipment. Customers are encouraged to participate in this assembly and test procedure.
Equipment is plated to certify that it conforms to the stringent design standards of the Concrete Plant Manufacturers Bureau (CPMB) division of the National Ready Mix Concrete Association (NRMCA).